| |
|
Completion Engineering
Production Optimization
The wellbore configuration and surface conditions dictate the management of the post-treatment cleanup and long-term production optimization of produced fluids from a well. IPT has unique internal reservoir engineering software and approaches customized from analyses of thousands of wells that match actual well producing conditions. This enhances our completion engineering ability to design wellbore configurations that optimize management of produced liquids, the production response and ultimate reserve recovery.
Management of produced fluids via appropriate wellbore and surface design is critical to avoid formation damage, realize maximum fracture length and ultimate recovery. At IPT we link this aspect to the completion/stimulation approach and long-term wellbore configuration to optimize the production response.
We use both finite difference and analytical reservoir simulators and link this with our Nodal analysis approaches to optimize the design process. Integrating this with our internal software developed from studying the management of produced fluids in thousands of wells enhances our ability to provide our clients the best possible well completion engineering advice.
|
| |
| |
| |
| |
|
|
| |
|
|
|
| |
|
|
|
Copyright © 2000-
Integrated Petroleum Technologies, Inc. All rights reserved.
|
 |
|
|
 |